How Long Does A Cement Floor Take To Dry. In hot, dry weather, especially if you’re pouring under the blazing sun, the heat can draw water out of wet concrete quickly, reducing pour time to. If the screed is more than 50mm allow 1 day per 1mm up to 50mm and then extra time for every millimetre over 50mm.

How Long Does Cement Take to Dry?
How Long Does Cement Take to Dry? from www.reference.com

How long does it take for screed to dry? For the maximum strength, concrete takes 28 days to fully cure. For the best result, you should cover it up with straw or burlap for seven days.

How Long Does Cement Take to Dry?

I recall this taking around 2 months to dry. Concrete is usually dry enough after 24 to 48 hours to walk on. If no darkening of the concrete or condensation is evident after 24 hours, the floor is dry enough to paint. It can still be easily broken apart at this point, and should be allowed to rest as it is for up to 24 hours undisturbed so that there is no risk of weaken its structure.